Petnar Living · Est. Hong Kong
Invisible Protection,
Visible Peace of Mind
Hong Kong's premier specialist in cat-proof screens and mosquito nets. Drill-free installation. One-year warranty.
Free Home MeasurementSection 01
Mosquito Nets
High-transparency, high-airflow insect screens for every window type. Enjoy the breeze, not the bugs.
Window Screen Series
Hinged / Swing Door
Classic swing-open design compatible with existing window grilles. Easy access for cleaning.
Roll-Up LITE
Lightweight roll-up design. Simple, reliable mosquito protection at great value.
Taiwan HISS HD Mesh
Premium imported HD mesh with ultra-clear visibility and smooth roll-up system.
Roll-Up Pro Max
Ultra-invisible design with cushioned retraction for a seamless finish.
*Not for classic aluminium windows
Safety Lock Roll-Up
Roll-up mosquito net with child-safe lock to prevent accidental opening.
Vertical Sliding
Up-and-down slide for narrow window frames where side space is limited.
Magnetic Detachable
Strong magnetic edge seal — snaps on and off for effortless cleaning.
Custom Small Window
Tailor-made for bathroom vents, kitchen louvres, and other compact openings.
Balcony Door Series
Safety Lock Roll-Up Door
Full-height roll-up mosquito screen for balcony and patio doors. Enjoy cross-ventilation without insects.
Steel Mesh Folding Door
Ultra-tough stainless-steel mesh in an accordion-fold frame. Anti-insect plus added security.
Mesh Density Comparison
Higher mesh count = finer weave = better insect defence. See the real difference:
Section 02
Cat-Proof Screens
Anti-scratch, anti-push, anti-escape. Keep your fur babies safe without compromising your view or ventilation.
Window Screen Series
Safety Lock Roll-Up
Dual safety-lock mechanism prevents clever cats from opening it themselves.
Roll-Up Pro Max
Ultra-slim invisible design with smooth roll-up mechanism.
*Not for classic aluminium windows
Hinged / Swing Door
Classic swing-door design with robust latch. Compatible with existing window grilles.
Vertical Sliding
Space-saving up-down slide mechanism ideal for narrow window frames.
Removable Washable Slider
Mesh panel detaches for easy cleaning.
*Not for classic aluminium windows
Balcony Door Series
Safety Lock Roll-Up Door
Designed for balconies and full-height glass doors. Larger mesh area, reinforced structure, smooth push-pull operation with safety lock.
Extreme Durability Test
Our high-tenacity anti-scratch mesh stands up to the most determined cats. Don't take our word for it:
Portfolio
Real Installations Across Hong Kong
From luxury towers and village houses to government institutions — we’ve done it all.
As Seen On
Media Coverage & KOL Endorsement
Featured on ViuTV
KOL Coey — Real Installation
See how popular Hong Kong influencer Coey chose Petnar Living to protect her beloved cats — beautifully integrated into her home design.
Trusted by Celebrities, Schools & Government Bodies
Other Professional Services
Aluminium Window Repair
Quick fixes for hinges, screws, cracked glass, and aged hardware.
Window Inspection
Licensed one-stop inspection service meeting Buildings Department requirements.
Water Leakage Repair
Replace worn seals and silicone to permanently fix window leaks.
Full Window Replacement
Complete removal and professional fitting of new aluminium windows.
Visit Our Showroom
Experience the full product range in person. Touch, test, and speak with our team.
Frequently Asked Questions
Are the cat screens really scratch-proof? My cat is very strong.
What mesh density should I choose for mosquito nets?
Is drill-free installation really secure? Will it damage my window frames?
Can I keep my existing window grilles and still install screens?
My windows are an unusual shape — can you still fit screens?
Protect Your Family &
Beloved Pets Today
Contact our team for a free home measurement and personalised consultation.
Get a Free Quote© 2026 Petnar Living. All rights reserved.
